The door is installed.
The door is positioned so that we can pour a concrete floor, if at a later date we want a one. Meanwhile we'll add some road base to bring the floor up and eliminate the gaps at the bottoms of the sidewalls, and add a threshold under the door.
The barn contractor will put on the correct-colored corner pieces soon. We'll clean out the trash & spare steel panels from inside, and move in the camping pop-up trailer, the dumping trailer, and the tractor. Carl's stuff, rescued from the flooded storage in Longmont and from his basement, will be moved from the garage to the barn. I get to park my truck inside again.
And since we don't expect more snow for a few days, I hope to get the trench dug to get electric power to the barn. A licensed electrician will install basic service, safely & according to code. I'll put in lights and outlets myself. Carl has loaned several fluorescent lights to the project.