The crew started again at 7 AM. They quickly finished a little framing, then draped rolls of insulation from the peak down. It's thin, but is rated at R-10. The metal roof & siding is 26-gauge steel.The crew split in two, and roof and wall went up simultaneously.
The inside face of the insulation is a plastic film.
By 4 PM both halves of the roof and both sides were done.
Work on the back began, but it wasn't finished by dark.
No comments:
Post a Comment